Greenhouse Configurator.
Greenhouse Configurator — 10-Step Project Wizard & RFQ Prefill
Configure a commercial greenhouse in 10 steps — country, climate, crop, size, budget, production goals, hydroponics, automation, energy and water. Generate a project summary and pre-fill a supplier-neutral RFQ.
Frequently asked questions
Five inputs decide almost everything else: crop and growing system, cultivated area and phasing, site climate extremes (temperature, humidity, wind and snow loads), water source and water analysis, and available electrical capacity. Structure type, covering, ventilation, screening, cooling, heating, irrigation, fertigation and automation follow from those inputs. Any of them left blank is filled in by each manufacturer with a different assumption, which is the usual reason two proposals for the 'same' greenhouse cannot be compared.
Structure and covering, foundations and civil works, ventilation, cooling and heating, screens, irrigation, fertigation equipment, water treatment, growing system or substrate, climate control and automation, electrical, energy and backup, packhouse and pre-cooling, then installation, commissioning, training and spare parts. Splitting the project this way exposes the packages a supplier has quietly excluded — civil works, electrical connection and water treatment are the three most often left out of a headline price.
Water quality versus fertilizer solubility, irrigation flow versus dosing capacity, fertigation controller versus climate computer, drain recirculation versus disinfection, greenhouse climate design versus crop assumptions, and imported equipment versus local civil and electrical works. Each sits between two contracts, so it is nobody's scope unless the RFQ names an owner for it.
Indicative planning ranges: net house USD 8–20/m², single-span polytunnel 25–50, multi-span mid-tech 50–120, Venlo glass 150–350, and semi-closed controlled-environment 300–600. Climate severity typically adds 5–35%, site works 15–30% and financing costs 8–15%. These are feasibility figures for budgeting only — binding pricing comes from suppliers once site data and specification are fixed.
When land control, water source and analysis, electrical capacity, crop plan, area, technology tier, budget band and target timeline are all documented, and one written specification exists that every supplier will quote against. Until then a requirement is scoped as 'early concept' or 'needs clarification' and is reviewed manually before anyone is contacted.
One private brief is submitted; a sourcing specialist reviews it manually, identifies the missing information and normalises it into a single written specification; qualified manufacturers, integrators and EPC contractors are approached only after that internal approval; returned offers are normalised to the same scope, lead time and delivery terms so they can be compared line by line. No supplier is contacted automatically and no buyer contact details are released automatically.
Answer ten short questions. We generate a structured project summary and pre-fill a supplier-neutral RFQ that a sourcing specialist dispatches to qualified global manufacturers, integrators and EPCs. SeedMatchGroup is not a manufacturer or reseller.
The operating system for greenhouse procurement.
Eight structured stages — from a first project brief to phase-2 expansion — run on one supplier-neutral platform. Buyers stay in control, suppliers compete on merit.
- Stage 01
Requirements definition
Crop, area, climate, budget, timeline and export goals captured in a structured brief.
- Stage 02
Project configuration
Structure, hydroponics, fertigation, climate, energy and automation sized to the brief.
- Stage 03
RFQ generation
One private, structured RFQ — no supplier is disclosed to competitors.
- Stage 04
Qualified supplier discovery
Independent global manufacturers, integrators and EPCs bid to the same spec.
- Stage 05
Solution evaluation
Side-by-side comparison on price, spec, lead time, warranty and references.
- Stage 06
Financing options
Trade finance, equipment finance, project finance and government-programme routing.
- Stage 07
Project execution
Contracting, logistics, installation and commissioning coordinated end-to-end.
- Stage 08
Ongoing expansion
Phase 2 CAPEX, retrofits, cold chain and new markets — same supplier-neutral platform.
