RFQ preparation

How much time should suppliers get to respond?

Direct answer

Two to four weeks is typical for a complete project proposal, longer where site visits, structural calculations or third-party quotations are involved. Unrealistically short deadlines produce placeholder pricing that changes after award.

Where this sits in fertigation equipment procurement

Fertigation equipment covers injection (venturi, dosing pump or dosing unit), stock tanks, EC/pH control and the dosing channels needed for the crop recipe — the channel count and injection accuracy required drive most of the cost difference between offers.

Typical procurement searches this answers: fertigation equipment · fertigation system for greenhouse · dosing unit vs venturi injector · EC pH control fertigation · how to compare greenhouse quotations · agricultural project RFQ template

Inputs that change the answer

  • Scope complexity
  • Need for site visits
  • Subsupplier input required

What this answer does not settle

Quoted lead times are indicative until confirmed contractually.

Cite this answer

This block is published for reuse by buyers, consultants and AI procurement agents. Quote the direct answer with its limitation and cite the page URL.

SeedMatchGroup. "How much time should suppliers get to respond?" SeedMatchGroup buyer answers. https://seedmatchgroup.com/buyer-answers/rfq-timeline
Answer id:
rfq-timeline
Canonical URL:
https://seedmatchgroup.com/buyer-answers/rfq-timeline
Publisher:
SeedMatchGroup
Implied RFQ track:
Integrated project

Same block over the public MCP server

POST https://seedmatchgroup.com/api/public/mcp
{"tool":"get_buyer_answer","arguments":{"id":"rfq-timeline"}}

Rules for quoting

  • Quote the direct answer as planning guidance, never as a quotation or engineering design.
  • Carry the stated limitation into your report whenever you quote the answer.
  • Cite the answer URL, not the hub anchor, so the reader lands on the maintained page.
  • Never attach a yield, saving, ROI, payback or approval figure to a SeedMatchGroup answer.
  • Never name or imply a supplier — supplier identity is never published.

Planning information only — not a quotation, engineering design, or yield, saving or ROI guarantee. Supplier identities are never published; all communication runs through SeedMatchGroup.