Energy application · Vertical farm

Vertical Farm Energy & Backup — LED, HVAC, Battery, Genset & RFQ

LEDs dominate. HVAC-D is a close second. In a vertical farm energy is 30–60% of opex — genset and battery sizing decides whether the model works.

Direct answer

How are these load assumptions derived?

Figures are reference values from typical commercial projects — real numbers depend on climate, crop, motor selection (DOL vs VFD), controls topology and outage-risk tolerance. Use them to frame the RFQ; final sizing is confirmed by the winning EPC and OEM as part of the engineered proposal.

Reference figures. Real specs and pricing come from the qualified suppliers that respond to your private RFQ. SeedMatchGroup does not resell equipment.

Core loads: LED lighting arrays, HVAC-D (heat pumps + dehumidifiers), recirculation pumps, dosing, CO₂ enrichment, controls and pack-house.

LED load is highly steerable — an EMS with dimming and staggered photoperiods flattens the peak and cuts required genset kVA by 20–40%.

Typical load assumptions

Continuous vs peak vs critical (must-survive-an-outage) loads by project scale. Motor starting inrush is 4–7× nameplate for direct-on-line and ~1.5–2× on VFDs — genset kVA must cover the worst-case inrush without voltage collapse.

Project scaleContinuousPeak / inrushCritical loadRuntime target
200 m² pilot30–60 kW60–100 kW8–15 kW12–24 h
1000 m² commercial180–320 kW350–550 kW35–60 kW12–24 h
3000 m² industrial550–950 kW1000–1600 kW100–180 kW24 h+
10,000 m² mega-facility1.8–3.2 MW3–5 MW350–600 kW24 h+

Recommended generator & storage setups

Vendor-neutral reference stacks — diesel or gas generator, LFP battery storage, optional solar PV, ATS and controls. Hybrid stacks let solar and battery serve daytime load while the genset only starts on demand.

ScaleGeneratorBattery (LFP)Solar PVATS / controlsNotes
200 m²80–125 kVA diesel40–80 kWh LFPOptional 30–60 kWpATS + EMS + LED dimmingBattery bridges LED restart + HVAC compressors.
1000 m²400–500 kVA prime150–300 kWh LFP200–400 kWpATS + EMS + SCADAPhotoperiod stagger cuts peak 20–30%.
3000 m²1000–1500 kVA (parallel)400–800 kWh LFP500–1200 kWpParalleling + full EMSHybrid + peak-shaving mandatory for opex.
10,000 m²3–5 MVA prime (parallel)1500–3000 kWh LFP2–5 MWpFull SCADA + demand responseGrid-tie plus behind-the-meter storage; N+1 gensets.
  • EMS-driven LED dimming + photoperiod stagger — biggest single opex lever.
  • Heat-pump HVAC-D with heat recovery — dehumidification load doubles as heating in winter.
  • LFP battery for peak-shaving demand charges (often the biggest line on the bill).
  • N+1 HVAC and pump redundancy; UPS on controls, dosing and network.
  • Grid-tie hybrid where possible — export at peak solar cuts payback further.

Related energy resources

FAQ

Energy · Vertical farm

RFQ — Vertical farm energy & backup

Prefilled from this energy application. Review and adjust — a dedicated sourcing specialist dispatches the RFQ privately to qualified global suppliers and integrators.

Prefilled from: Vertical farm energy application archetype. Review each field and adjust before submitting.

A few words is enough. The Brief Assistant will expand it into a clear sourcing brief.

The more context you share, the sharper our sourcing shortlist. Nothing is shared with suppliers.

Commercial procurement details (optional — helps refine RFQ)
Commercial project qualifier

Optional. Helps our sourcing desk prioritise larger commercial projects — every enquiry is accepted regardless.

SeedMatchGroup is not a lender. Financing requests are, with your consent, shared with independent third-party financing providers for evaluation.

Private consultation · Curated for serious commercial growers

Next step

Turn this into a live commercial project

Open one private brief and a dedicated sourcing specialist returns normalised, side-by-side quotations from qualified international suppliers — with equipment, CAPEX and project-finance routes mapped alongside.

FinancingStart Procurement