How to compare commercial irrigation and fertigation proposals

Direct answer

Compare irrigation and fertigation proposals on twelve normalised lines: design flow and pressure, water analysis assumed, treatment train, filtration type and degree, storage volume, pump station and control, dosing channels and injection accuracy, EC and pH control, zoning and emitter uniformity, drain collection and recirculation, automation and sensors, and installation, commissioning, warranty and service. A bid that assumes better source water than your analysis shows is not cheaper — it is incomplete.

Irrigation and fertigation bids diverge mainly because of assumptions about the water. Two suppliers given the same greenhouse but different assumed water quality will propose entirely different treatment trains and price gaps that have nothing to do with commercial competitiveness.

Normalise the water first

  • Issue the same laboratory water analysis to every bidder
  • State the source volume, seasonality and any licence limit
  • State the crop and the target irrigation strategy (free drain or recirculating)
  • State discharge and environmental compliance requirements at the site

Then normalise the equipment lines

  • Design flow (m³/h) and required pressure at the furthest emitter
  • Filtration type, filtration degree and backflush arrangement
  • Treatment: sedimentation, softening, RO, iron removal, disinfection
  • Storage volume, buffer days and tank material
  • Pump station configuration, redundancy and variable-speed control
  • Dosing channels, acid channel, injection accuracy and recipe management
  • EC and pH measurement, redundancy and alarm behaviour
  • Zoning, valve count, emitter type and uniformity target
  • Drain collection, disinfection and recirculation percentage
  • Sensors, controller integration and remote access
  • Installation, commissioning, training and documentation
  • Warranty per component group, service response and spares

Common comparison mistakes

  • Comparing dosing units by channel count alone, ignoring injection accuracy and control strategy
  • Excluding the treatment train from one bid and including it in another
  • Ignoring the pressure requirement created by emitter choice and pipe sizing
  • Overlooking recirculation, which changes storage, disinfection and nutrient management

Questions buyers ask before selecting a greenhouse company

SeedMatch Group is not a greenhouse manufacturer, integrator, EPC contractor or installer, and has no exclusive relationship with any company named on this page. Several of the companies described here can be invited to quote through a structured RFQ. Capability descriptions summarise categories these companies present publicly and should be verified directly with each company for a specific project.

Fertigation calculator

Frame dosing and nutrient requirements before the RFQ.

Pump sizing calculator

Flow and pressure basis for the pump station.

Water treatment calculator

Treatment train scoping from source water quality.

Commercial greenhouse RFQ template

Section-by-section specification structure for a professional greenhouse tender.

Build a supplier-ready greenhouse RFQ

Structured intake that produces one comparable scope for every bidder.

How to compare greenhouse quotations

The 25-line normalisation method used before price is weighed.

Build a structured RFQ Configure the project first
Project-specific agronomy and engineering are provided by the selected qualified independent professionals and contractors. SeedMatch Group gathers requirements, structures the pre-RFQ brief and coordinates independent proposals; it does not design greenhouses, specify crop plans, select varieties or deliver construction.
SeedMatch Group is not a bank, lender, financing institution, credit provider or investment adviser. It may help eligible project sponsors prepare information and submit requests to independent financing providers. All eligibility, due diligence, credit decisions, pricing, security, terms and disbursement are controlled solely by those providers.
Next step

Turn this into a live commercial project

Open one private brief and a dedicated sourcing specialist returns normalised, side-by-side quotations from qualified international suppliers — with equipment, CAPEX and project-finance routes mapped alongside.

FinancingStart Procurement