Energy application · Greenhouse

Greenhouse Energy & Backup — Loads, Generators, Battery Storage & RFQ

Commercial greenhouses lose crops in hours when climate, fogging or fertigation drop out. A properly sized generator with LFP battery bridging and an ATS is the single most bankable energy specification you can make.

Direct answer

How are these load assumptions derived?

Figures are reference values from typical commercial projects — real numbers depend on climate, crop, motor selection (DOL vs VFD), controls topology and outage-risk tolerance. Use them to frame the RFQ; final sizing is confirmed by the winning EPC and OEM as part of the engineered proposal.

Reference figures. Real specs and pricing come from the qualified suppliers that respond to your private RFQ. SeedMatchGroup does not resell equipment.

Core loads: climate computer, HAF fans, exhaust and pad-fans, fogging pumps, boiler / heating pumps, dehumidification, fertigation dosing, LED or HPS supplemental lighting, and pack-house cooling. Peak load is dominated by cooling and lighting.

Critical (must-survive) load is usually 15–25% of the peak: controls, alarms, HAF circulation, one dosing pump and one exhaust bank. Everything else can be shed by the EMS on outage.

Typical load assumptions

Continuous vs peak vs critical (must-survive-an-outage) loads by project scale. Motor starting inrush is 4–7× nameplate for direct-on-line and ~1.5–2× on VFDs — genset kVA must cover the worst-case inrush without voltage collapse.

Project scaleContinuousPeak / inrushCritical loadRuntime target
0.5 ha (mid-tech)25–45 kW60–90 kW10–15 kW8–12 h
1 ha (high-tech)60–110 kW150–250 kW20–35 kW12–24 h
3 ha (high-tech + LEDs)180–320 kW450–700 kW60–90 kW12–24 h
5–10 ha (industrial)350–700 kW900–1600 kW120–200 kW24 h+

Recommended generator & storage setups

Vendor-neutral reference stacks — diesel or gas generator, LFP battery storage, optional solar PV, ATS and controls. Hybrid stacks let solar and battery serve daytime load while the genset only starts on demand.

ScaleGeneratorBattery (LFP)Solar PVATS / controlsNotes
0.5 ha80–100 kVA diesel20–40 kWh LFPOptional 30–60 kWpATS + climate UPS 3–5 kVABackup-first; solar optional for opex.
1 ha200–275 kVA diesel or gas60–120 kWh LFP80–150 kWpATS + UPS 5–10 kVA + EMSHybrid pays back on daytime cooling loads.
3 ha + LEDs500–650 kVA prime200–400 kWh LFP250–500 kWpATS + UPS 15–20 kVA + EMSLED dimming under EMS smooths grid + genset load.
5–10 ha1000–1500 kVA (parallel gensets)500–1000 kWh LFP600–1200 kWpParalleling gear + full EMS + SCADAN+1 redundancy; genset synchronisation.
  • ATS on the mains feed — 8–15 second unattended restart, not manual.
  • UPS on climate computer, network and dosing controls — bridges the ATS gap.
  • Genset in a sound-attenuated enclosure with bunded fuel tank sized for the runtime target.
  • LFP battery over lead-acid — 8–15 year life, safer thermal behaviour, better DoD.
  • EMS to sequence solar, battery and genset, and to shed non-critical load on outage.

Related energy resources

FAQ

Energy · Greenhouse

RFQ — Greenhouse energy & backup

Prefilled from this energy application. Review and adjust — a dedicated sourcing specialist dispatches the RFQ privately to qualified global suppliers and integrators.

Prefilled from: Greenhouse energy application archetype. Review each field and adjust before submitting.

A few words is enough. The Brief Assistant will expand it into a clear sourcing brief.

The more context you share, the sharper our sourcing shortlist. Nothing is shared with suppliers.

Commercial procurement details (optional — helps refine RFQ)
Commercial project qualifier

Optional. Helps our sourcing desk prioritise larger commercial projects — every enquiry is accepted regardless.

SeedMatchGroup is not a lender. Financing requests are, with your consent, shared with independent third-party financing providers for evaluation.

Private consultation · Curated for serious commercial growers

Next step

Turn this into a live commercial project

Open one private brief and a dedicated sourcing specialist returns normalised, side-by-side quotations from qualified international suppliers — with equipment, CAPEX and project-finance routes mapped alongside.

FinancingStart Procurement