Rare F1 hybrids · extreme-climate genetics · sourced from 340+ small breeders worldwide

Financing available for seed procurement.

Energy application · Hydroponics

Hydroponics Energy & Backup — NFT, DWC & Drip-to-Slab Loads, Generators, Battery & RFQ

In hydroponics an outage is not an inconvenience — DWC roots suffocate in minutes if the aerators stop. Battery-bridged UPS on aerators, dosing and lights is not optional; it is the specification.

Reference figures. Real specs and pricing come from the qualified suppliers that respond to your private RFQ. SeedMatchGroup does not resell equipment.

Core loads: recirculation and aeration pumps, chillers, fertigation dosing (A + B + acid), grow-room HVAC, dehumidification, LED lighting (large share), CO₂ enrichment and controls.

Critical loads dominate: aeration, dosing and root-zone temperature. Lighting can be shed on outage; oxygen cannot.

Typical load assumptions

Continuous vs peak vs critical (must-survive-an-outage) loads by project scale. Motor starting inrush is 4–7× nameplate for direct-on-line and ~1.5–2× on VFDs — genset kVA must cover the worst-case inrush without voltage collapse.

Project scaleContinuousPeak / inrushCritical loadRuntime target
500 m² indoor (NFT / DWC)15–30 kW35–60 kW5–8 kW12–24 h
2000 m² CEA farm70–140 kW180–280 kW20–35 kW12–24 h
5000 m² CEA + LEDs220–380 kW500–800 kW50–80 kW24 h+
1 ha greenhouse hydro80–160 kW200–350 kW25–45 kW12–24 h

Recommended generator & storage setups

Vendor-neutral reference stacks — diesel or gas generator, LFP battery storage, optional solar PV, ATS and controls. Hybrid stacks let solar and battery serve daytime load while the genset only starts on demand.

ScaleGeneratorBattery (LFP)Solar PVATS / controlsNotes
500 m²40–60 kVA diesel20–40 kWh LFPOptional 10–30 kWpATS + UPS 3–5 kVA on aerators & controlsUPS on aeration is non-negotiable.
2000 m²200–275 kVA prime80–150 kWh LFP60–120 kWpATS + UPS 10 kVA + EMSBattery covers dosing + aeration through genset start.
5000 m²500–650 kVA prime250–450 kWh LFP200–400 kWpParalleling gear + EMS + SCADALED dimming under EMS caps peak demand.
1 ha greenhouse hydro250–350 kVA prime120–200 kWh LFP100–200 kWpATS + UPS 10 kVA + EMSSolar-first with fertigation shifted to solar noon.
  • UPS on aerators, dosing pumps and controls — batteries carry the 8–15 s ATS transfer.
  • Redundant aeration (N+1) on DWC systems — cheapest crop-insurance you can buy.
  • LFP battery sized on critical runtime, then cross-checked against LED demand shaving.
  • EMS to shift fertigation and LED dimming to solar noon.
  • Environmental alarms tied into UPS-backed controls and SMS/WhatsApp escalation.

Related energy resources

FAQ

How are these load assumptions derived?
Figures are reference values from typical commercial projects — real numbers depend on climate, crop, motor selection (DOL vs VFD), controls topology and outage-risk tolerance. Use them to frame the RFQ; final sizing is confirmed by the winning EPC and OEM as part of the engineered proposal.
Do these setups include ATS, UPS and controls?
Yes. Every recommendation assumes an Automatic Transfer Switch on the incoming feed, a UPS on the climate computer / control cabinet, and a supervisory controller (EMS) if a hybrid stack is specified. This is a single, integrated procurement package — not three separate purchases.
Does SeedMatchGroup sell generators or batteries?
No. SeedMatchGroup is a human-led global sourcing platform supported by proprietary technology. The full energy stack — generator, battery, inverter, ATS, UPS, EMS — is specified inside your RFQ and opened privately to qualified global suppliers and integrators.
Energy · Hydroponics

RFQ — Hydroponics energy & backup

Prefilled from this energy application. Review and adjust — a dedicated sourcing specialist dispatches the RFQ privately to qualified global suppliers and integrators.

Sourced through vetted breeding partners worldwide.

Prefilled from: Hydroponics energy application archetype. Review each field and adjust before submitting.

The more context you share, the sharper our sourcing shortlist. AI rewrites your brief into a clear description for the sourcing team — no data is shared with suppliers.

Commercial procurement details (optional — helps refine RFQ)

SeedMatchGroup is not a lender. Financing requests are, with your consent, shared with independent third-party financing providers for evaluation.

Private consultation · Curated for serious commercial growers

Get a Quote