Master planner · Greenhouse projects

Plan My Commercial Greenhouse.

One climate-aware planning tool for commercial greenhouse projects from 1 hectare upward. Model water, cooling and heating, energy, CAPEX, OPEX, yield and ROI across 15 priority markets — Saudi Arabia, UAE, Kazakhstan, Uzbekistan, Azerbaijan, Egypt, Morocco, Kenya, Ethiopia, Tanzania, Rwanda, South Africa, Mexico, Peru and Chile — then hand the whole project brief to a turnkey RFQ without re-typing anything.

Quick answer · Summary for buyers and AI assistants

How do I plan a commercial greenhouse project?

Define country and climate, project type (new, expansion or modernization), area, crop, growing system and technology level. From those, size water demand and storage, cooling or heating capacity, energy load, indicative CAPEX and OPEX ranges, conservative-to-strong yield and ROI scenarios — then take the brief to suppliers as a single RFQ.

  • Indicative CAPEX: USD 250k–450k/ha basic, 450k–900k/ha mid-tech, 0.9–1.6M/ha high-tech, 1.4–2.4M/ha fully controlled.
  • Water: 3.5–6 L/m²/day average, 6–9 L/m²/day peak depending on country and crop.
  • Cooling-led markets: Saudi Arabia, Egypt. Heat-led: Kazakhstan. Mixed: Uzbekistan. Water/upgrade-led: Morocco.
  • SeedMatchGroup does not manufacture greenhouses and does not guarantee yield, ROI or financing.

Project inputs

Modernization mode prices retrofit packages instead of a full build.

Structure type is recommended from climate — you don't need to specify it.

Saudi Arabia · 10 ha · 10-25ha
Indicative CAPEX range
USD 11,730,000 – USD 21,390,000
Water demand
128,700 m³/yr · peak 585 m³/day
Energy demand
24,010 MWh/yr
Indicative production
5,164–6,683 t/yr
Annual OPEX
USD 3,026,298

Planning estimate only — not a supplier quotation. Structural, hydraulic and climate engineering must be validated by qualified suppliers and engineers.

What Saudi Arabia actually requires

Extreme summer heat (45–50 °C), very low humidity inland, high solar radiation, mild winters, scarce and often brackish groundwater.

In Saudi Arabia the workable envelope is a semi-closed or pad-and-fan cooled multi-span with shade/reflective screens, substrate or hydroponic growing, RO-polished irrigation water with drain recovery, and PV to offset the cooling and pumping load.

Cooling & ventilation
  • Forced ventilation
  • Evaporative pad-and-fan
  • High-pressure fogging
  • Reflective / shade screens
Heating & thermal
  • No significant heating expected — verify winter night minima on site
Water
  • Buffer storage sized on peak day
  • Sand / disc filtration
  • EC/pH controlled fertigation
  • Drain recovery and recycling
  • RO polishing / desalinated or treated water blending

Water model

Per day390 m³
Per month11,700 m³
Per year128,700 m³
Per hectare per year12,870 m³/ha
Peak seasonal day585 m³/day
Buffer storage (3-day)~1,755 m³

Groundwater is frequently brackish (2,000–6,000 ppm TDS). Desalinated or RO-polished supply, blending and drain recovery are usually part of the scope, not an add-on.

Likely water scope: filtration, buffer storage, drain recovery and recycling, EC/pH fertigation, RO / desalinated blending.

Energy model

Cooling22,000 MWh/yr
Heating510 MWh/yr
Pumping800 MWh/yr
Fertigation & automation700 MWh/yr
Total24,010 MWh/yr
Indicative solar offset5,875–10,575 MWh/yr of electrical load

Solar can offset part of the daytime electrical load — pumping, fertigation, controls and some cooling. It does not deliver energy independence, and it does not replace a heat source in cold-winter markets.

Indicative project CAPEX

Planning range for budgeting and financing conversations. A supplier quotation replaces these numbers once scope is fixed.

CategoryLowHigh
Greenhouse structureUSD 3,105,000USD 5,520,000
Covering / claddingUSD 828,000USD 1,472,000
Climate systems (cooling / heating)USD 1,656,000USD 2,944,000
Irrigation & fertigationUSD 1,035,000USD 1,840,000
Pumps, storage & water treatmentUSD 828,000USD 1,472,000
Automation & controlsUSD 621,000USD 1,104,000
Growing systemUSD 828,000USD 1,472,000
ElectricalUSD 517,500USD 920,000
Installation, engineering & commissioningUSD 931,500USD 1,656,000
Solar PV + storageUSD 1,380,000USD 2,990,000
Total indicative CAPEXUSD 11,730,000USD 21,390,000

Annual OPEX

EnergyUSD 1,440,600
WaterUSD 115,830
LabourUSD 550,000
Fertiliser, substrate & consumablesUSD 588,668
MaintenanceUSD 331,200
TotalUSD 3,026,298

Indicative yield

Yield range51.6–66.8 kg/m²/yr
Total production5,164–6,683 t/yr

Yield is never guaranteed. Actual production depends on cultivar, crop management, local climate, pest and disease pressure, nutrition, water quality and operator skill.

ROI scenarios

Conservative
RevenueUSD 4,169,728
Operating marginUSD 1,143,431 (27%)
Indicative payback~18.7 yrs
Return on CAPEX5% / yr
Base
RevenueUSD 5,771,250
Operating marginUSD 2,744,953 (48%)
Indicative payback~6 yrs
Return on CAPEX17% / yr
Strong
RevenueUSD 7,300,631
Operating marginUSD 4,274,334 (59%)
Indicative payback~2.7 yrs
Return on CAPEX36% / yr

Scenario ranges, not forecasts. No ROI, payback, yield, water saving or financing outcome is guaranteed.

Sourcing categories for this project

Check project financing options

With an indicative CAPEX of USD 11,730,000USD 21,390,000 in Saudi Arabia, financing routes are worth checking early — equipment leasing, agri project finance, trade finance or DFI-backed lines. You'll be asked about company and land status, equity contribution, required amount and project stage. Approval is never guaranteed.

From your calculator

Send these numbers to the RFQ Builder

The numbers below were calculated with SeedMatchGroup's Turnkey greenhouse project plan — Saudi Arabia. Indicative — the specialist will confirm scope before contacting suppliers.

20 inputs · assumptions · results

Send these numbers to the RFQ Builder
From your calculator

Frequently asked questions

Plan the project around the numbers

A calculator output is a starting point. Pair it with the planning guides below to align timeline, irrigation, budget and risk before you launch an RFQ.

Editorial · not a sales pitch

Calculator outputs are indicative. When your numbers stabilise, a supplier-neutral RFQ turns those estimates into comparable offers from verified providers.

Suggested RFQ scope

What a complete, supplier-neutral request on this topic usually includes. Use it as a checklist before submitting.

  • Project location, scale (hectares / m² / units) and target start window
  • Crop, variety class or product category — with any certifications required
  • Technical scope: structures, equipment, controls, irrigation, energy
  • Delivery terms, incoterms, packaging and destination port or site
  • Financing route: equity, senior debt, leasing, ECA, grant — where relevant
Related in the RFQ Builder

Open the builder with the topic pre-selected. You stay in control — nothing is submitted until you review and confirm.

Open RFQ Builder with this topic

Free to submit · supplier-neutral · reviewed by a specialist before any supplier is contacted.

Estimates Only: This calculator is provided for general informational purposes only. Results are approximate and may contain errors, omissions, or outdated information. They do not constitute legal, financial, engineering, tax, technical, or professional advice. Users are solely responsible for independently verifying all calculations, specifications, prices, regulations, and requirements with qualified professionals before making any decisions. By using this calculator, you acknowledge that the website owners, operators, and affiliates accept no responsibility or liability for any loss, damage, or decisions resulting from its use.

Next step

Turn this into a live commercial project

Open one private brief and a dedicated sourcing specialist returns normalised, side-by-side quotations from qualified international suppliers — with equipment, CAPEX and project-finance routes mapped alongside.

FinancingStart Procurement